The rest of the windows and front door has been installed. The front door turned out really nice. I was wondering how it would look without sidelights. It looks fine. This week, the duct work for the HVAC is being installed. We are going with a Dual unit downstairs. It uses a heat pump until the temperature drops into the 30’s and then it uses gas. Tomorrow, we plan to work on finishing up the boxes for the lights and plugs. Once we are done with that, then we can have the electrician start running the wire. Not to much to write about at this time. Spring is around the corner, so things should start picking up.